COURT CONSTRUCTION (HARD) |
||||||||||||||||||||||||||||||||||||||||||
|
Our professional sports construction and resurfacing crews focus on projects in North Carolina, South Carolina, Georgia, Tennessee and Florida. We are also associated with other certified court builders in other parts of the country to make sure that a wider region is covered, and not just the areas listed above. Acrytech Color-Guard (with UV-15) |
|||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||
|
|
|
GREEN |
|
|
|
||||||||||||||||||||||||||||||||||||||
|
Basketball Courts |
|||||||||||||||||||||||||||||||||||||||||||
|
Full property site preparation and certified foundation compaction should be completed before final grading process is to begin. (Usually Required by Owner to have been completed. The next step in the process includes the use of laser controlled paving and grading equipment, which will provide the ultimate uniform asphalt or concrete depth, with the exact surface pitch. Paving process begins with 4 inches of sub-base and 2 inches of premium sports asphalt. Concrete sub base process to meet project specifications. Once the Paving process is completed, our crews using a laser guided diamond saw, cut the edges to provide a professional finish. After this is completed the new paved area will need to cure for two weeks before any other works can be done. At this time our crews will pressure wash each court to check if there are any low spots that may have occurred during the paving process. Usually at this time the Sports Lighting, if required, is installed. Fence post, fence material, net post and center anchor foundations are next to be installed. Special care is taken to make sure all of our net foundations are deep and strong for years of intense usage. Fence posts are highly recommended to be centered 6 to 8 inches inward from the edge of paving. The fence material should be raised (fixed) 3/4 to 1/2 inch above the playing surface for our crew to properly squeegee the coating around the base of the fence installation. Two Coats of our Sports Court Resurfacer is applied for all new courts. Three to four Coats of our high performance Sports Color Coatings will be applied. Finally, playing lines are professionally hand painted . Nets and Posts are installed. KEY ADVANTAGES TO THE ALL- WEATHER TENNIS & SPORTS COURTS All Weather Courts are low in maintenance and only require All Weather Courts maybe left open all year long, therefore extending
Please contact our office or website for further information. |
|||||||||||||||||||||||||||||||||||||||||||
|
Reference Section (Myrtle Beach Area List) Sports Project Photo Galleries Click for MS Word Doc Click for PDF Doc |
|||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||